Leisure Heating

Sales: 0115 937 2727

1.5kW Ruby 'slim' short wave emitter (Extra-long Leads)

More Views

1.5kW Ruby 'slim' short wave emitter (Extra-long Leads)

Regular Price: £60.00

Special Price £39.00

including vat

SKU118

Availability: In stock


1.5kW Ruby 'slim' short wave emitter230v. Ceramic end caps and fly leads.Used in many quartz infra-red space heatersCode LHQIR1500ruby slim


Description

Details

Description

1.5kW Ruby short-wave emitter. SK15 end caps and extra-long 500mm fly leads fitted with spade terminals.

The spade terminals can be cut off when fitting to heaters with screw connections.

230V - 240V.  Overall length end to end 350mm. Used in many quartz infra-red space heaters.

Modern alternative to Ruby SLEEVED elements which are generally being phased out.

Specification

Wattage: 1500W
Voltage: 230-240V
Length: 350mm
Cap Type: SK15 / fly leads
Lead length 500mm
Wavelength: Shortwave

This lamp fits:

  • Strynex wall mounted heaters
  • Quartzray wall mounted heaters
  • Older versions of the Birchwood Rhino Heater 240V version with wired lamps
  • The RedRad portable infrared heater (not to be confused with Big Rad)
  • Older Style Dimplex Church Heating solutions
  • Some industrial paint dryers
  • Many other older heaters that use wired fit elements with Ruby sleeved or Ruby slim lamps

    If unsure which element you need for your heater. please ring 0115 9372727 for advice
Additional Information

Additional Information

upc No
length No
width No
height No
Manufacturer No
Reviews