1.5kW Ruby ‘Slim’ Short-Wave Emitter (Extra-long Leads)

Original price was: £60.00.Current price is: £39.00.Including VAT

Description

1.5kW Ruby ‘Slim’ Short-Wave Emitter (Extra-long Leads). SK15 end caps and extra-long 500mm fly leads fitted with spade terminals.

The 1.5kW Ruby Slim Short-Wave Emitter with extra-long leads fits a wide range of quartz infra-red space heaters. It comes with SK15 end caps and 500mm fly leads fitted with spade terminals. You can cut off the terminals when fitting to heaters with screw connections.

The lamp runs at 230–240V and measures 350mm end to end. The ruby coating cuts glare and delivers efficient short-wave heat.

This model replaces older ruby sleeved elements, which are now being phased out, and gives a modern, durable heating solution.

Original price was: £60.00.Current price is: £39.00.Including VAT

15 in stock

sagepaypaypalamexvisamastercardmaestro

Description

Description

1.5kW Ruby ‘Slim’ Short-Wave Emitter (Extra-long Leads). SK15 end caps and extra-long 500mm fly leads fitted with spade terminals.

The 1.5kW Ruby Slim Short-Wave Emitter with extra-long leads fits a wide range of quartz infra-red space heaters. It comes with SK15 end caps and 500mm fly leads fitted with spade terminals. You can cut off the terminals when fitting to heaters with screw connections.

The lamp runs at 230–240V and measures 350mm end to end. The ruby coating cuts glare and delivers efficient short-wave heat.

This model replaces older ruby sleeved elements, which are now being phased out, and gives a modern, durable heating solution.

Specifications:
  • Wattage: 1.5kW
  • Voltage: 230-240V
  • Length: 350mm
  • Cap Type: SK15 / fly leads
  • Lead length: 500mm
  • Wavelength: Shortwave
This Lamp Fits:
  • Strynex wall-mounted heaters
  • Quartzray wall-mounted heaters
  • Older versions of the Birchwood Rhino Heater 240V version with wired lamps
  • The RedRad portable infrared heater (not to be confused with Big Rad)
  • Older Style Dimplex Church Heating Solutions
  • Some industrial paint dryers
  • Many other older heaters that use wired fit elements with Ruby sleeved or Ruby slim lamps

If unsure which element you need for your heater, please ring 0115 9372727 for advice.

Reviews

There are no reviews yet.

Be the first to review “1.5kW Ruby ‘Slim’ Short-Wave Emitter (Extra-long Leads)”